FIRST ARTICLE INSPECTION SERVICE INDIA

First Article Inspection
Service in India

Complete FAI Dimensional Inspection Service for Automotive, Aerospace & OEM Suppliers — Including GD&T Verification, AS9102 Documentation & PPAP Submission Support.

4000+ Projects
1000+ Clients
9 Industries
6+ Years Exp
Manufacturing Domino Effect

The One Inspection That Sets the Standard for Everything That Follows

Tooling Setup

Tool Completed

First-Off Part Produced

First-Off Part Produced

FAI Inspection Workstation

FAI Inspection

❌ FAI FAIL Tool Rework • Production Delay • OEM Rejection
✅ FAI PASS Production Release • PPAP Submission • OEM Approval
Interactive Verification

FAI Approval Simulator

14
27
41
63

Verification Status

Characteristic #41 .... Missing
Characteristic #63 .... Missing
REJECTED
Digital Blueprint Wall

What A Complete First Article Inspection Covers

1
2
3
1

Dimensional

Full Dimensional Verification of all lengths, widths, diameters, and angles.

2

GD&T

GD&T Callout Verification for position, profile, runout, and form.

3

Compliance

Documentation & traceability matching exact blueprint requirements.

100% Characteristic Accountability
Measurement Control Room

Full Dimensional Verification

Linear Dimensions [+]
Nominal 150.00
Actual 150.02
Dev. +0.02
PASS
Angular Dimensions [+]
Nominal 45.00°
Actual 44.95°
Dev. -0.05°
PASS
Surface Deviations [+]
Nominal 0.00
Actual 0.03
Dev. +0.03
PASS
Feature Locations [+]
Nominal T.P 0.1
Actual 0.04
Dev. 0.04
PASS
[Image: Dimensional report screenshots]
Aerospace Documentation Vault

AS9102 First Article Inspection Documentation

1. Documentation Review

  • Drawing Revisions
  • Specifications
  • Certifications

2. Measurement Accountability

  • Balloon Characteristics
  • GD&T Results
  • Traceability

3. Submission Package

  • AS9102 Forms
  • Final Approval Package
[Image: AS9102 documentation package / Aerospace component inspection]
Submission Package Builder

FAI Report Generation & Submission Formatting

1. Balloon Drawing

2. Dimensional Table

3. GD&T Results

4. Deviation Maps

5. Traceability Records

6. AS9102 / PPAP Format

OEM READY
[Image: Actual report screenshots]
Technical Service Overview Reviewed by APJ 3D Engineering Desk • Updated September 2026

What is First Article Inspection (FAI) Service India?

Dimensional Inspection is the formal verification of physical components against engineering drawings and CAD models using bridge CMMs, portable articulated arms, optical comparators, and laser trackers.

When to Select This Service

Choose dimensional inspection for First Article Inspection Reports (FAIR), PPAP Level 3 supplier submissions, batch quality audits, and shop-floor fixture alignment adhering to ASME Y14.5 and ISO 1101 standards.

First Article Inspection (FAI) Service India Technical Specifications

Technical Capabilities & Verification Standards

Verified engineering parameters, hardware precision, and compliance benchmarks applied across all deliverables.

Engineering Parameter APJ 3D Capability & Precision Range Compliance Standard / Verification
Measurement Equipment Bridge CMM (ZEISS / Renishaw), Portable Romer Arms, Laser Trackers, Vision Measuring Systems ISO 10360 Precision Compliance
Measurement Uncertainty Bridge CMM: E0 = 1.5 + L/350 µm; Portable Arm: ±0.025 mm; Laser Tracker: ±0.015 mm/m NABL / ISO 17025 Calibrated Standards
GD&T Verification Full ASME Y14.5 & ISO 1101 evaluation (Profile, True Position, Runout, Parallelism, Perpendicularity) Automated Inspection Programs
Inspection Frameworks AS9102 FAIR (Aerospace), AIAG PPAP Level 3 (Automotive), ISO 9001 Batch Quality Audits Standard Ballooned Drawing Reports
Inspection Environment Class 10,000 Temperature & Humidity Controlled Metrology Laboratory (20°C ± 0.5°C) Standard Reference Metrology Environment
Software & Reporting ZEISS CALYPSO, PolyWorks Inspector, PC-DMIS, Geomagic Control X Comprehensive Graphical & Tabular PDFs
Turnaround Time 24 to 48 Hours for standard First Article & batch inspection lots Pan-India On-Site CMM Arm Support
FAQ

Frequently Asked Questions

What is included in a First Article Inspection Report (FAIR)?

A FAIR includes a ballooned engineering drawing matching every dimension to an itemized inspection table, raw actual values, upper/lower tolerances, out-of-spec flags, and tool calibration certificates per AS9102 or customer templates.

Can you inspect parts according to PPAP Level 3 requirements?

Yes. We generate full dimensional results, Gage R&R studies, process capability studies (Cp/Cpk), material test reports, and Part Submission Warrants (PSW) for automotive Tier-1 supplier audits.

Do you provide on-site inspection for large tooling and weld fixtures?

Yes. Our metrology team deploys portable articulated arms and laser trackers directly to your manufacturing plant for on-site jig alignment, weldment inspection, and stamping die verification.

How do you establish datum reference frames for GD&T inspection?

We align physical components using primary, secondary, and tertiary datum features (planes, cylinders, holes) as specified on engineering drawings per ASME Y14.5M, eliminating alignment ambiguity.

What turnaround time can we expect for batch inspection?

Standard First Article inspections deliver in 24 to 48 hours. Ongoing production batch inspections can be scheduled with dedicated capacity and automated CMM routines.

Ensure Your First Article Becomes Your Production Standard

Complete GD&T Verification for Automotive, Manufacturing, Casting & OEM Supply Chains.

PPAP Ready Datum Traceable OEM Submission Ready